
Add to Cart
1.5mm-3.0mm 2.0m width welded wire mesh machine in rolls price
The raw material can be low-carbon steel wire, galvanized steel wire, stainless steel wire etc.
The production line consists of main mesh welding machine, electrical control cabinet, repairing machine, repairing table, bobbin machine, bobbins, bracket for longitude wires, wire pay off stand.
2. The raw material is applicable for low-carbon steel wire, galvanizing wire and stainless steel.
3. It has advantages of reasonable design, low noise, stable working, easier operation etc.
4. The mesh size is precise and can be set according to customers’ requirements.
5. It adopts sealed &water cooling welding transformers, the scoria can not easily goes in.
It mainly used for the construction mesh, breeding mesh (rabbit cage, fox cage, mink cage etc.)
Mode | JT-DNW-1 | JT-DNW-2 | JT-DNW-3 |
Wire diameter | 0.4-0.65mm | 0.65-1.8mm/0.8-2mm/0.65-2mm | 1.0-2.2mm/1.2-2.5mm |
Aperture/pitch | 1/4",1/2" | 1/2", 1", 1.5" ,2",2.5",3" | 1", 2", 3", 4" ,5",6" |
6.25, 12.5mm | 12.5, 25, 50mm | 25, 50, 75, 100mm | |
Mesh width | Max.1m, 1.2m | Max.1.2m,1.5m, 2m | Max.1.2m, 1.5m, 2m, 2.5m |
Motor | 3kw | 3kw; 4kw | 4kw; 5.5kw, 7.5kw |
Welding speed | Max.75 rows/min | Max.120-180 rows/min | Max.80-120 rows/min |
Transformer | 50kva*3 | 60kva*4;60kva*5, 60kva*7 | 70kva/80kva*5/6/7/8 |
Weight | 1.5T | 2T, 2.5T | 2T, 2.5T, 3T, 3.5T |
1 Easy operated
2 High production
3 Advanced technology electronics.
4.Separate control technology, make welding transformers working separately to reduce needed capacity.
5.Different position of button and control box with inverter (Taiwan Delta), not easily broken like before, easier to operate.
6.Sealed welding transformers, it has 8 degrees, can be adjusted for different wire diameters.
7.Square steel bottom instead of angle iron bottom. 1.5mm steel plate instead of 0.2-0.3mm steel plate, more stable.
ABOUT AFTER SALES SERVICE:
1. Machine to be installed and commissioned by our technicians. We can send our technician to install the machine accordingly if the buyer need.
2. Training: the buyer should charge of visa, return ticket, food and accommodation overseas and USD100/person/day for salary.
3. Technician: Normally need one or two technician.
4. Training time: one week (contains the time of installation and adjustment)
5. It is in same condition if the buyer need the seller to send the interpreter.